Plumbing Demolition and Fixture Install in an educational facility
in Orlando, FL
Our team successfully completed the Plumbing work.
We followed construction documents and local codes in the demolition phase, removing existing plumbing infrastructure within designated construction areas. We installed new shut-off valves for piping servicing to enhance safety and functionality. Additionally, as per the provided drawings, we demolished existing sinks and capped all sanitary drains, vents, and domestic water lines.
For the rough-in and fixtures installations, we put in new fixtures, including p-traps, clean-out stop valves, faucets, supports, fittings, and all related components essential for proper operation.
Our approach ensured that the plumbing work was executed smoothly and in accordance with project requirements and specifications.
Your project is very close to
starting to take shape
its the construction of the foundation that will stand the
test of time.